Full width home advertisement

Post Page Advertisement [Top]

Montreal, Canada - Airlines and aircraft manufacturers are delaying or shelving their projects as they just concentrate on surviving during the ongoing global crisis.

Boeing has recently announced that it gave up the joint venture deal with the Brazilian airframer Embraer. The American Aerospace giant also shelved its New Mid-Market-Airplane (NMA) project in January this year, which was stalled in the wake of the 737 MAX grounding that came into force in March 2019 after two fatal crashes.

Since then, Boeing has been looking at distilling the two-aircraft NMA program into one new 757-style plane, while studying a more modest 767 upgrade, some sources claimed.

That would have laid the groundwork for the future MAX successor, an embryonic project known as Future Small Airplane.

"Everything on NMA, FSA, and so on has been stopped for now,"

a person familiar with the matter said.

Other projects likely to take a backseat include a previously unreported plan to give the 767 wide-body jet a new lease of life with new wings and engines. British data provider Flightglobal reported in October that Boeing was talking to General Electric about a "767-X" with new engines. But people familiar with the matter said Boeing had instead been studying a costlier plan to add new wings as well.

Boeing declined to comment on it but denied any sweeping halt.

"We will continue to look at what the future market will need and invest in research and development,"

a spokesperson said.

Since Boeing delivered its final passenger 767 in 2014, the model has enjoyed a rebirth as a cargo workhorse and needs modifying to meet 2028 emissions standards. One insider said the 767 study focused on the plane's role as a freighter, while others saw a possible passenger role.

757-PLUS

A 757 replacement would counter strong sales of the Airbus A321 and allow Boeing to pioneer systems needed in future replacements of all small and medium jets - notably cockpits. Boeing stopped making the roughly 240-seat 757 in 2004. Any replacement would have slightly more range and seats, with one source nicknaming it "757-Plus".

At the rival Airbus, work continues on the A321XLR, a long-range addition to its best-selling narrow-body family. But the company has scrapped a hybrid-electric flight demonstrator it was working on with Rolls-Royce for future "decarbonized" planes called E-Fan-X. And Chief Executive Guillaume Faury is weeding out a rash of eye-catching but non-core projects inherited from his predecessor, insiders say.

Faury has said Airbus remains committed to working on green aircraft of the future but at a slower pace amid the crisis. Also on the back-burner are confidential studies for freighter versions of A330neo or A350 aircraft, sources said.

"Airbus is always looking at new concepts based on existing platforms, but it is really premature to speculate about the scope and timing of future Airbus freighter opportunities,"

a spokesman said, declining to comment on specific proposals.

Analysts say Boeing's 777X, which first flew in January, could be further delayed due to a slump in demand for widebody aircraft due to the international travel restrictions.

Bottom Ad [Post Page]